ACHIEVEMENTS

  • 2.5MW wind turbine installed at Accolade Park. Expected to provide c. 50% of Accolade Park’s consumption.
  • Dry slat install on all bottling lines, significantly reducing water consumption & additionally reducing consumption of chemical lubricant & electricity.
  • All electricity supplied to Accolade Park is sustainably sourced
  • Metal halide external lamps replaced by LED, now use 73% less electricity
  • Won MOYT Sustainable Manufacturer
  • Winner of the Supply Chain & Logistics Innovation – The Drinks Business Green Awards 2019”